1.Connection of hydraulic system
1.Pay attention to the oil level. Too little impact testing machine can not operate normally, too much will cause hydraulic oil leakage from the operating oil tank
2.Hydraulic oil will pass through the wire mesh filter, impact test box generally use hydraulic oil, the application of large viscosity of hydraulic oil in summer, the application of small viscosity of hydraulic oil in winter
3.Drain the residual oil in the tank regularly and remove the residue in the tank.
4.Use a suitable wrench to connect the oil pipes, if the seamless copper pipe is connected to the main enginei, and rely on the movement of the console to adjust the spacing to connect the console end.
5.Check whether the gasket at the joint is complete. If it is damaged due to transportation, install it with a new gasket attached to the impact testing machine to prevent oil leakage during high pressure.
6.Remove the bindings of each part, and clean the inside of the oil pipe with clean kerosene, especially the thread connection of each oil pipe.
II,Preliminary Calibration of Device Accuracy of Impact Test Chamber
The main body of the testing machine shall use the frame level or the wire hammer in the accessories to calibrate the straightness of the column in the two straight directions, and adjust it by piercing the small iron piece at the bottom of the main body. Install the anchor screws with spring washers. Use high-strength cement mortar to punch and cast the foot screws in all places, and fill the gaps between the impact testing machine and the ground. Water protection for more than a week, then consolidate the screw
3.Preparation before installation
1.Dig a hole under the azimuth of the impact testing machine device, the size is longer than the base of the impact testing machine, and the width is greater50CM.Depth not less30CM
2.The device should be placed in a clean, dry, vibration-free and controlled room temperature.10To35degrees Celsius inside the room. And the room should have enough space to ensure that there is more70CMSpace for testing and daily protection.
3.The impact test box shall be connected with three boxes and four wires. The power supply shall be equipped with air switch and leakage protection device. The distance between the wire and the ground shall be greater150CM,A manual switch shall be provided on the wire to control the power supply of the impact tester.
4.The grade of pouring intensity in the pit shall not be lessC20When pouring concrete, leave holes for anchoring anchor screws and pipes for device circuits and sensors.
IV,The impact test chamber is mainly maintained by the main engine, oil source and control system.
1.Maintenance of oil source
1.1Regularly check whether there is oil leakage at the host and oil source. If oil leakage is found, replace the sealing ring or combination pad in time.
1.2According to the running condition and running period of the machine, replace the oil suction filter and filter element and replace the hydraulic oil regularly.
1.3Long-term not to do the experiment, pay attention to turn off the host power. If it is in the standby state, the transfer switch should be turned to the "load" gear, because the transfer switch is turned to the "rewind" gear, the electromagnetic reversing valve has been energized.
2.Maintenance of control system
2.1Regularly check whether the connection line of the rear panel of the controller is in good contact.
2.2If the machine is not used for a long time after the test. Closed controller and computer
2.3The interfaces of the controller are in one-to-one correspondence.
2.4Connectors on the controller must be powered off
3.Mainframe maintenance
3.1The machine with the fixture should be coated with anti-rust oil
3.2The jaws need to be cleaned frequently to prevent oxide skin from blocking the piston and oil leakage.
3.3The sliding surface of the plated steel plate and the lining plate and the dovetail groove on the lining plate should be kept clean, and a thin layer of molybdenum dioxide and grease should be applied regularly.
3.4Regularly check the transmission condition of the sprocket, and tighten it in time if it is loose.