 Hot and cold shock test chamberIt is equipped with universal casters. If the equipment is directly placed on the first floor, it can be directly unloaded by manual hydraulic forklift and then pushed into the laboratory. If the test box is placed upstairs, it should be considered whether there is an elevator, the width and height of the elevator, and whether the aisles, corridors and doors that need to enter the laboratory can enter smoothly. If there is no elevator for manual handling, special care should be taken.

    For example, due to site problems, the cold and hot shock test chamber must rely onManual handlingWhen going upstairs, the following points need special attention:

1,The standard size of the cold and hot shock test chamber is divided42,80,100,150Five, low temperature range is0,-20,-40,-60,-70,-80What needs to be stated here is that when the size of the test box exceeds100liters, the temperature range exceeds-60We do not recommend handling, because the weight and volume are too large, which may cause damage to personnel and machines and major safety hazards. You can use cranes, change the placement site or change the size.

 

2、If the test box is within the scope of handling, the manufacturer suggests to find a professional moving company and a manufacturer technician to guide it on site, prepare complete tools, have enough space at the entrance of the corridor and the average strength distribution of the handling personnel, and move correctly under the guidance of the technician.

 

3、DueHot and cold shock test chamberIt is refrigerated by compressor refrigerant, so it must not be tilted during transportation (for example, the tilt angle cannot exceed15Degree), should be like handling air conditioning vertical parallel movement, to avoid Freon leakage caused by refrigeration.

 

4、The outer container of the test box is treated with steel plate antistatic plastic spraying, and relevant parts are made of stainless steel, so avoid impact, bump and scratch during transportation, so as not to affect the appearance of the machine (if there are scratches or paint drops on the surface of the test box, the whole test box shell needs to be sprayed again, and the project is huge and costly). If it is filled separately, the appearance will still be affected.

 

5、The hinges of the door need to be careful to avoid loosening and causing the door to sag or the center of gravity is unstable.

 

6、If it is a test chamber with humidity, beware of water level cup broken.